Steel strapping tempering line with paiting equipments

1.2 Work bin

1.3 Electric wedding machine   

1.4 Debur machine   

1.5 Bridle rolls

1.6 Rewinding machine with 16 roller

1.7 Another set of cutting or slitting knife

1.8 Spare part 1: three sets of reel, one for 300mm, another for 406mm

2. Oven:

2.1 Annealing oven  

2.2 Wax tray and wax oven for drying

2.3 Power distribution

More on machine parts >>>

 

More on specification >>>

Shift production capability: 8 tons/shift(8 hours)

Worker number: 4 Total equipment 

requiring power: 130 kilowatts Factory

 space: 13, 40 meters long, 4 meters high and 8 meters wide.

 Delivery time: 60 days to complete each production line.

two 40 feet containers

More on specification >>>

Shift production capability: 8 tons/shift(8 hours)

Worker number: 4 Total equipment 

requiring power: 130 kilowatts Factory

 space: 13, 40 meters long, 4 meters high and 8 meters wide.

 Delivery time: 60 days to complete each production line.

two 40 feet containers

Please down load the lay-out >>>

Please see the vidoe of machines in testing for customers at spot >>>

 

Get a quotation now by writing few words below!

 


 


 

 

 

 

(after submit please click Anti spam box in next page ,thanks!)